|
NAME |
SPECIFICATIONS |
1 |
Vehicle Model |
KMH5254TDYDF6 |
2 |
Engine Model |
D6.7NS6B290 |
3 |
Engine Power |
Cummins 290 HP |
4 |
Engine Displacement |
6700ML |
5 |
Transmission |
Datong 8 Gear |
6 |
Tire Specification |
295 Vacuum Tire |
7 |
Wheelbase |
4350+1350MM |
8 |
Total Weight |
25000KG |
9 |
Curb Weight |
12200KG |
10 |
Rated Loading Capacity |
12670KG |
11 |
Vehicle Dimension |
10680*2500*3200 |
12 |
Tank Volume |
23CBM |
13 |
Fuel Type |
Diesel |
14 |
Emission Standard |
National VI |
15 |
Water Pump Model |
60/90 |
16 |
Tank Material |
Q235 Carbon Steel |
Chassis configuration:
Cummins engine with 290 horsepower, Datong 8th gear, D320 semi luxury KL cab, 5.5T front axle, dual 10T rear axle, 295 vacuum tires, wheelbase of 4350+1350300 double-layer beam, electric glass, central control, airbag seats, air conditioning, and driving recorder.
Installation configuration:
1. The tank is approximately 23 cubic meters and can be equipped with a Type 30 fog cannon.
2. The side lights are electrified, and two red width lights are standard above the tail of the tank.
3. The standard front spray is a duckbill straight jet, and the standard rear hedge can be adjusted according to needs.
4. Pattern anti slip platform, customized bolt buckle for the back cover of the barrel.
5. The front spray, rear hedge, rear spray, and side spray, as well as the green anti-aircraft gun ball valves, all use 50 large diameter stainless steel ball valves.
6. The new bearing type water cannon is more durable.
7. 60-90 type water pump.
8. Anti corrosion flange gasket.
9. Aluminum is not easy to explode after sprinkling.
10. Automatic welding of tank body (Lincoln welding machine and power supply from the United States), automatic welding of assembled panels, welding of head and circumferential seams, no porosity,
The weld seam is aesthetically pleasing.
11. The side guard and rear bumper are all bolted together for easy disassembly and maintenance.
12. Plastic mudguards, replacing iron mudguards, are more lightweight and connected with bolts for easy disassembly.
13. The connection between the front and rear main pipes is a 6-hole circular flange, which is not easy to pad.
Are you trader or manufacturer? |
We are the original factory, we have our own workshops and professional production lines. |
Do you accept customization? |
Yes, we fully accept customized services. |
How long is your lead time? |
The delivery time is 20-40 days as common, the exact delivery time depends on the order and the current production& shipping condition. |
What are your terms of payment? |
L/C and T/T. |
What logistics methods can you use for transportation? |
We support various transportation methods:
(1) Shipping by frame container, ro-ro or bulk ship.
(2) For China's inland neighboring countries, we can ship the truck by road or rail.
(3) For urgently needed spare parts, we can ship by express or air. |
Can I visit your factory? |
You are more than welcomed to visit our workshop, we are located in Suizhou, Hubei province. |
Other Products In Our Factory