Customization: | Available |
---|---|
After-sales Service: | with After-Sale Service |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Sewage suction trucks(also known as vacuum sewer trucks, vacuum suction trucks, or vacuum tank trucks) are used to suck, collect, cleaning and transport sewage, sewer and waste liquid, they are equipped with powerful vacuum pumps and cylindrical debris tanks. the tank is equipped with rubber strips to ensure reliable sealing of the tank. it also has a liquid-level tube that allows you to easily observe the liquid level of the tank.
SEWAGE SUCTION TRUCK PARAMETERS | ||
Dimensions | Overall dimensions (L*W*H) (mm) | 10000x2550x3950 |
Curb weight (kg) | 17650 | |
GVW (kg) | 25000 | |
Wheelbase(mm) | 4300+1350 | |
Engine | Model | MC07.31-60 |
Power(kw/HP) | 228/310 | |
Displacement(L) | 6.87L | |
Emission standard | CHINA VI | |
Gear box | Brand | SINOTRUK |
Model | HW10 | |
Gears | 10+2 | |
Brakes | Type | Drum |
ABS | 4S/4M | |
Steering | Type | BOS |
Chassis Frame | Dimensions(mm) | 280(8mm+5mm) |
Suspension | Front | 11 |
Rear | 10 | |
Axle | Front axle | H653 7000kg |
Rear axle | MCJ11; 18000kg*2; Rear axle ratio:5.29. |
|
Tires | Type | 11.00R20 |
Fuel Tank | Capacity | 300L |
Cab | Type | SITRAK G5-M |
Equipment | Knob type PTO | |
Terminal emission monitoring device | ||
Sinotruck Intelligent cabin B version | ||
Protections | Type | Middle bumper (metal) |
TANK | TOTAL VOLUME (CBM) | 22 |
SEWAGE VOLUME (CBM) | 16 | |
WATER VOLUME (CBM) | 6 | |
TANK MATERIALS | CARBON STEEL Q235 | |
HIGH PRESSURE PUMP | FLOW RATE | 350L |
PRESSURE (MPA) | 13-15 | |
HIGH PRESSURE PIPE | 80M,φ25MM | |
SUCTION | AUXILIARY ENGINE | YES |
SUCTION PUMP | 258 | |
AIRLOW RATE (M³/H) | 2100 | |
PRESSURE (MPA) | -0.093 | |
SUCTION HEIGHT | 10M | |
SUCTION PIPE | 10M,102MMΦ,PVC | |
OTHER DETAILS | 1 grenade nozzle, 1 diamond nozzle, 1 dredging tugboat, and 1 cleaning spray gun. Rear mounted hydraulic cleaning reel- 180 degree hydraulic rotation (Hydraulic control for left and right placement, tube rolling up, and tube release of the reel); Automatic overflow protection; Pressure relief safety valve; Lifting angle:25 degrees;There is an 8mm partition between the two compartments, and the cylinder head adopts automatic welding. There is safety support below the lifter , and water and sewage are interconnected. There is a three claw cement tank mouth installed on the top of each clean water tank and sewage tank. One DN150 and one DN100 drain outlet on the rear end. On the right side of the vehicle, there is a DN100 side suction and DN100 clear water valve. The inlet elbow is 8mm+10mm, and the tank top is made of patterned plates with protective railings on both sides. A toolbox is installed on each side. License plate lights, LED arrow lights, and night work lighting. |
|
Are you trader or manufacturer? | We are the original factory, we have our own workshops and professional production lines. |
Do you accept customization? | Yes, we fully accept customized services. |
How long is your lead time? | The delivery time is 20-40 days as common, the exact delivery time depends on the order and the current production& shipping condition. |
What are your terms of payment? | L/C and T/T. |
What logistics methods can you use for transportation? | We support various transportation methods: (1) Shipping by frame container, ro-ro or bulk ship. (2) For China's inland neighboring countries, we can ship the truck by road or rail. (3) For urgently needed spare parts, we can ship by express or air. |
Can I visit your factory? | You are more than welcomed to visit our workshop, we are located in Suizhou, Hubei province. |